Sr. No. | Project Description | Client Name | Project Status |
1
|
Consultancy service Contract for Complete Survey, Detailed Engineering Design, Preparation of Detailed Project Report and Tender Document for Mekelle - Haragebeya - Semera - Tadjourah Port Standard Gauge Railway Project connecting Djibouti and Ethiopia in Africa - Total Length 680 kms.
|
The Consortium of Overseas Infrastructure Developers (OID) & Convergent Business Solutions (CBS) FZE, Addis Ababa, Ethiopia - for Ethiopian Railways Corporation (ERC)
|
Work completed and commissioned.
|
2
|
Carrying out Feasibility Study, Detailed Project Report for potential Opportunities for purpose of getting funding from Financing agencies like EXIM bank or other similar funding organizations, Preparation of Technical Proposal For Bidding, Directly representing OIA's business interest in proposed Railway projects etc.
|
Overseas Infrastructure Alliance (India) Pvt. Ltd. (OIA), Andheri, Mumbai
|
The assignment is nearly completed.
|
3
|
Additional Rail Siding Facilities at In plant yard of Manikgarh Cement Unit - II, at Gadchandur, Chandrapur Maharashtra.
|
Manikgarh Cement Unit - II (A Div. of Century Textiles & Industries Ltd.), Gadchandur, Maharashtra.
|
Work completed in all respects, commissioned and completion certificate received.
|
4
|
Consultancy Service for PFT Rail Siding at Sanand, Gujarat Including Mobilization and preparation of concept plan, Preparation of ESP, Preparation of DPR, Signaling Plan, & Estimate, taking Approval of ESP and DPR at Divisional & HQ Level. Also Preparing Detailed BOQ.
|
The Thar Dry Port – a Unit of Hasti Petro Chemical & Shipping Ltd., Ahmedabad.
|
Work completed and commissioned.
|
5
|
Survey, design and Construction supervision of Railway Siding for Chittorgarh Cement Plant of Lafarge India Pvt. Ltd., taking off from Gambhiri Road Railway station, under Ratlam Division of Western Railway.
|
Alpha One Infra (India) Pvt. Ltd., New Delhi/ Lafarge India Pvt. Ltd. Chittorgarh.
|
Work completed and commissioned.
|
6
|
Detailed Engineering Consultancy Services - Geometric Design of alignment and track for Lot No. 102 from Ch. 1170 to 1266 = 96 km, out of 96 km, 50 km. bet. Km. 1221.000 to 1266.600 including detour portion between Bhaupur and Khurja.
|
STUP consultants Pvt. Ltd., Vashi, Navi Mumbai.
|
Work completed.
|
7
|
Detailed design for RUB No. 131/1 in Mumbai- Goa NH-17 at CH:131.328 on PNVL-Pan-Roha doubling project
|
Central Railway
|
Work completed.
|
8
|
Consultancy assignment for Preparation of of LWR/CWR Diagram for DFCC Eastern Corridor Lot No. 101, 102 & 103.
|
STUP Consultants Pvt. Ltd. Vashi, Navi Mumbai.
|
Work completed.
|
9
|
Project Management Consultancy, with survey & finalization of alignment, Preparation of Construction Drawings for Bridges and Culverts, Supervision of Earthwork in formation for Construction of Railway Siding takeoff work at Chittorgarh for Lafarge Cement Plant Project, Rajasthan –work outso urced by Alpha one Infra against its Contract with Lafarge India Pvt. Ltd.
|
Lafarge India Private Limited
|
Work completed.
|
10
|
Project Management Consultancy for Construction of Private Railway siding for Lafarge India Pvt. Ltd. at Gambhiri Road Railway Station, Ratlam Division of Western Railway.
|
Lafarge India Pvt. Ltd., Jaipur.
|
Work completed and commissioned.
|
11
|
Project Management Consultancy for Construction of Railway Siding at Sanand Station, Ahmedabad Division of Western Railway.
|
Alpha One Infra (India) Pvt. Ltd., New Delhi/ Hasti Petro Chemical & Shipping Ltd. Ahmedabad.
|
Work completed and yard commissioned.
|
12
|
Providing General and Project Management Consultancy Services as Independent Engineer for construction of Line No. 4 in AKBTPL yard at Dry Bulk Terminal at Tekra and approval from Railways.
|
Adani Kandla Bulk Terminal Pvt. Ltd., Ahmedabad.
|
Work completed.
|
13
|
Detailed Engineering & PMC for B. G. Conversion @ Udaipur Cement Works Ltd., Udaipur.
|
Udaipur Cement Works Ltd., Udaipur.
|
Work completed.
|
14
|
Consultancy for Horizontal & Vertical alignment design for DFCC Western Corridor Package 12 from Sachin to Vaitarna including Detours & Station yards and preparation of LWR diagrams and getting approvals.
|
STUP Consultants Pvt. Ltd., Vashi, Navi Mumbai.
|
Scope reduced to 15 TKMs, which has been
|
15
|
Consultancy services for feasibility study and details of project modification required @ Jhajjar Grinding Unit of JK Lakshmi Cement.
|
JK Lakshmi Cement, New Delhi.
|
Assignment completed.
|
16
|
Consultancy services for validation of common user facility cost with UTCL for Jhajjar Grinding Unit of JK Lakshmi Cement.
|
JK Lakshmi Cement, New Delhi.
|
Work completed.
|
17
|
Consultancy Services for feasibility study of Rail connectivity with block cost for one port location selected out of 4 port locations given between Ratnagiri & Terekhol in Ratnagiri & Sindhudurg Districts as part of Maharashtra Maritime Board (MMB) Contract.
|
Howe Engineering Projects (India Pvt. Ltd.), Ahmedabad.
|
Work completed and report submitted.
|
18
|
Design and Construction of Civil, Structures and Track Works, involving formation in embankment/cutting, Ballast on formation, Track Works, Bridges, Structures, Buildings, Yards, and integration with Indian Railway System and Testing & Commissioning on Design- Build Lump Sum basis of Khurja – Pilkhani Section (Approx. 222 route kms. of single line) of Eastern Dedicated Freight Corridor – Providing Pre-bid Consultancy Services for the Technical & Financial Bid.
|
G. R. Infraprojects Ltd., New Delhi.
|
Work completed.
|
19
|
Construction Consultancy Services for Development of Rail Siding and Rail Link for Fourth Container Terminal @ JNPT.
|
Cullen Grummit & Roe (India) Pvt. Ltd., Sanpada, Navi Mumbai.
|
Work completed.
|
20
|
Consultancy for Additional Services for Pre-DFC & Post DFC Consultancy Services for Development of Rail Siding and Rail Link for Fourth Container Terminal @ JNPT.
|
Cullen Grummit & Roe (India) Pvt. Ltd., Sanpada, Navi Mumbai.
|
work completed.
|
21
|
Design of major bridge no.786 & 793 and foot over bridges four line with ramps and staircase of SRPJ-ABR doubling project.
|
Rail Vikas Nogam Limited. RVNL,Abu Road.
|
work completed.
|
22
|
Consultancy services related to Engg. Services for assistance in getting approval for ESP and preparation of SIP and getting approval for Essar Oil depot @ Dahegaon Station, Wardha.
|
Essar Oil Limited, Equinox Tower 2, LBS Marg, Kurla, Mumbai.
|
work completed.
|
23
|
Consultancy Services for Railway Siding Work at Kairla Station for Pali Depot Project.
|
Essar Oil Limited, Equinox Tower 2, LBS Marg, Kurla, Mumbai.
|
work completed.
|
24
|
Consultancy Services for Railway Siding Work at Kalamboli Station for Kalburgi Cement Project.
|
Kalburgi Cement Private Limited.
|
work in progress.
|
25
|
Design and Drawings of RUB and ROB for Doubling of Track in Roha-Veer Section over Konkan Railway.
|
Konkan Railway Corporation Limited.
|
work in progress.
|
26
|
Design of Three nos. Foot over bridges over Two/Four/Six lines with ramps/staircase of Aburoad and Falna for Railway electrification work between Rani(EXCL) – PNU(EXCL) for NWR by RVNL.
|
Rail Vikas Nogam Limited. RVNL,Abu Road.
|
work in progress.
|
27
|
Project Management Consultancy Services and all works related to Engg. Consultancy works for for Essar Oil depot @ Dahegaon Station, Wardha.
|
Alpha One Infra (India) Pvt. Ltd.
|
work completed.
|
28
|
Design of Structural Design booklet at Major Bridge No.811,812 & 821 of ABR-SZA doubling project by RVNL.
|
Rail Vikas Nogam Limited. RVNL,Abu Road.
|
work completed.
|
29
|
Consultancy Services for Converting Existing Private Siding of CWC at Kalamboli into Brownfield PFT.
|
Alpha One Infra (India) Pvt. Ltd. for Kalburgi Cement Pvt. Ltd.
|
work completed.
|
30
|
Survey, Track Alignment Design, Setting out, layout calculation, curve calculation, speed on curve calculation, LWR/CWR plans, validation of various RDSO desigs/drawings of different components etc. for the Eastern DFCCIL project from Mughal Sarai to New Sonnagar and Chirailapathu (excluding New Karwandiaya – New Durgauti section) of Eastern Corridor.
|
Kalindee Rail Nirman A Division of Texmaco Rail & Engineering Limited.
|
work completed.
|
31
|
Consultancy Services for Converting Existing Private Siding of CWC at Kalamboli into Brownfield PFT.
|
Alpha One Infra (India) Pvt. Ltd. for Kalburgi Cement Pvt. Ltd.
|
Work completed.
|
32
|
Survey, Track Alignment Design, Setting out, layout calculation, curve calculation, speed on curve calculation, LWR/CWR plans, validation of various RDSO desigs/drawings of different components etc. for the Eastern DFCCIL project from Mughal Sarai to New Sonnagar and Chirailapathu (excluding New Karwandiaya – New Durgauti section) of Eastern Corridor.
|
Kalindee Rail Nirman A Division of Texmaco Rail & Engineering Limited.
|
Work in Progress.
|
33
|
Carrying out Waterway Calculations for Major Bridges in connection with doubling of track in Roha – Ver Section.
|
Konkan Railway Corporation Limited.
|
Work completed.
|
34
|
Consultancy for Railway Approval of Loading Platform along line No.6 at Peripheral yard of TCL at Mithapur for PY-3 & Py-4.
|
TATA Chemicals Ltd. Mithapur.
|
Work in progress.
|
35
|
Consultancy for Inspection of Existing PY-2 at Peripheral yard of TCL at Mithapur.
|
TATA Chemicals Ltd. Mithapur.
|
Work in progress.
|
36
|
Consultancy Services for Scrutiny & Assessment of ACC Cement Plant Existing Railway Yard at ACC Jamul Plant for improving the operational movement.
|
ACC Limited. Jamul Plant.
|
Work completed.
|
37
|
Consultancy Services for BPCL POL Loading Terminal Siding at Rasayani Railway Station on Panvel – Roha Section of Mumbai Division of Central Railway
|
PG Engineering Counsultancy Pvt. Ltd. Bharat Petroleum Corporation Limited.
|
Work in progress.
|
38
|
Consultancy Services for Scrutiny & Assessment of ACC Cement Plant Existing Railway Yard at ACC Wadi Plant for improving the operational movement.
|
ACC Limited. Wadi Plant.
|
Work completed.
|
39
|
Consultancy Services for Railway Siding Work at Kairla Station for Pali Depot Project.
|
Nayara Energy Ltd, Equinox Tower 2, LBS Marg, Kurla, Mumbai.
|
Work in progress.
|
40
|
Consultancy Services for Proposed Railway Siding for DLIPL between Hosur – Anekal Road Stations on Bengaluru taking off from Proposed New Station between AEK – HSRA of Bengaluru Division of SWR.
|
Distribution Logistics Infrastructure Pvt. Ltd.
|
Work in progress.
|
41
|
Consultancy Services for Railway Siding Work for Yard Remodeling at ACC Jamul Plant.
|
ACC Limited. Jamul Plant.
|
Work in progress.
|
42
|
Consultancy Services for Scrutiny & Assessment of ACC Cement Plant Existing Railway Yard at ACC Kymore Plant for improving the operational movement.
|
ACC Limited. Kaymore Plant.
|
Work in progress.
|
43
|
Consultancy Services for Railway Siding Work for Yard Remodeling at ACC Wadi Plant.
|
ACC Limited. Wadi Plant.
|
Work in progress.
|
44
|
Consultancy Service for PFT Rail Siding at Sanand, Gujarat Including Mobilization and preparation of concept plan, Preparation of ESP, Preparation of DPR, Signaling Plan, & Estimate, taking Approval of ESP and DPR at Divisional & HQ Level. Also Preparing Detailed BOQ.
|
The Thar Dry Port – a Unit of Hasti Petro Chemical & Shipping Ltd.
|
Work completed.
|
45
|
Phase-1: Balance Left Over OHE Works for Rail Infrastructure Facilities For Food Grain Storage Depot at Taloje, Navi Mumbai.
|
Adani Agri Logistic Limited
|
Work completed.
|
46
|
Phase -2: Balance Left Over OHE Work For Rail Infrastructure Facilities for Food Grain Storage Depot at Taloje, Navi Mumbai.
|
Adani Agri Logistic Limited
|
Work completed.
|
47
|
OHE, SWS & BT Contract for Gr.160, Design work of OHE for Railway Electrification in Rohtak(Excl.) – Bhatinda – Lehra Muhhabat(Incl.) Section of Northern Railway.
|
KEC International Limited, Worli, Mumbai.
|
Work is substantially completed.
|
48
|
Design work of OHE for Electrification in Erich road – Usargaon Section under RVNL Jhansi.
|
KEC International Limited, Worli, Mumbai.
|
Work is substantially completed.
|
49
|
Design work for design works of SS, SSP and TSS for Railway Electrification in Rohtak (Excl.) Bhatinda –Lehra Muhhabat (Incl.) Section of Northern Railway.
|
KEC International Limited, Worli, Mumbai.
|
Work is substantially completed.
|
50
|
OHE, TSS, SP/SSP/FP Design bet. Usgaon (excluding K.M 1265.00) to Bhimsen (including KM1334.00) in connection with doubling bet. Jhansi – Bhimsen Stations on JHS Divn., NC Rly.
|
ETF India Project Office, New Delhi.
|
Work is substantially completed.
|
51
|
Consultancy Services for Survey, Preparation of LOPS cum CSD for WDFC EMP-4 Project.
|
Larsen & Toubro Ltd., Construction, Faridabad.
|
Work Completed.
|
52
|
Consultancy Services for Survey, Preparation of LOPS cum CSD for ROHA-VERNA-RE-KRCL-Railway
|
Larsen & Toubro Ltd., Construction, Chiplun
|
Work in progress.
|
53
|
Consultancy Services for Planning, Preparation, Engineering, Preparation & Submission of Basic Drawings for 25 KV AC, 50 Hz, Single Phase Overhead Electrification of Adipur Mundra Port.
|
Howe Engg, Projects (I) Pvt. Ltd.
|
Work in progress.
|
54
|
Consultancy Services for Survey, Preparation of LOPS cum CSD works in connection with Third line between (Km 1289/0) Dholpur (Excluding) and (Km 1202/2) Antri Station (Including) on Jhansi Division of North Central Railway.
|
G R Infra Projects Ltd.
|
Work in progress.
|